Upcoming Construction Bid Opportunities within the next 12-18 months
(updated 2025-06-30)

Nelson Wastewater Treatment Facility Improvements

For more information visit the JCW Nelson website subcontractor page:  https://www.jcwnelson.com/subcontractors

OP Stream Crossings and Manhole Replacement

Advert. Date (est)

2026Q1

Const Duration (est)

19 months

Constr.
Range

$1-2M

Project Mgr: Shannon Parks

Scope of Work:

Relocation and installation of approximately 600 LF of 8" gravity sewer near 151st and Conser, stream crossing protection on an existing sanitary sewer between 143rd Street and Eby Street, plus replacement of 26 miscellaneous manholes in the gravity sewer system.

Disciplines:

SEWER: gravity

NCAC Equalization Basin and Solids Thickening Project

Advert. Date (est)

2026Q1

Const Duration (est)

23 months

Constr.
Range

$16-18M

Project Mgr: Ansel Chin

Scope of Work:

Replacement of Intermediate Pump Station (IPS) with an integrated equalization (EQ) tank,  odor control, piping from the headworks to the EQ/IPS, and replacement of the existing dissolved air floatation thickener (DAFT) with two smaller DAFT units.

Disciplines:

Electrical, Structural, Mechanical, HVAC, Process Equipment

Middle Basin Asset Renewal Project

Advert. Date (est)

2026Q2

Const Duration (est)

24 months

Constr.
Range

$8.5-9.5M

Project Mgr: Jeena John

Scope of Work:

Asset renewal and operational improvements including solids pumping and grit system improvements, chemical tank and feed system improvements, piping improvements, and electrical and controls improvements.

Disciplines:

Civil, plumbing, electrical, structural

Tomahawk Wastewater Treatment Facility - Process Improvements

Advert. Date (est)

2026Q2

Const Duration (est)

29 months

Constr.
Range

$10-12M

Project Mgr: John Rosson

Scope of Work:

New odor control covers and system, misc process, mixing, and piping improvements.

Disciplines:

Electrical, Structural, HVAC, Pumps, Process Equipment

NOTE: All construction dates and fee estimates are approximate and subject to change; please refer to the final bid documents for the latest information.